WHY YOUR RANDOM EATING SCHEDULE IS RISKY FOR YOUR HEALTH
Monday, 15 August 2016 - 9:47 | Views - 1,040

Do you ever postpone dinner because you’re in the middle of a project? Or skip breakfast because you overslept?
As long as you avoid binging later on, it’s no big deal, right?
Well, maybe not.
Two new papers published in the Proceedings of the Nutrition Society suggest that it’s not just what you eat, but when you eat that affects your health.
Having irregular meals may set you up for obesity, high blood pressure, and type 2 diabetes regardless of how many total calories you’re consuming.
One of the reviews examined international eating patterns and found a possible link between obesity and eating more calories in the evening.
The other paper concluded that people who consistently ate six meals a day had better cholesterol and insulin levels than those who ate meals with variable frequency in this case, anywhere from three to nine meals a day.
“We found that adults consuming calories during regular meals—at similar times from one day to [the] next were less obese than people who have irregular meals, despite consuming more calories overall,” says Gerda Pot, PhD, a visiting lecturer in the Diabetes and Nutritional Sciences Division at King’s College London who worked on both papers.
Really? While it doesn't seem to make sense that meal timing could affect your health that much, the studies are part of an emerging field called chrononutrition, in which researchers are exploring the link between metabolism and circadian rhythms.
Many metabolic processes in the body such as appetite, digestion, and the metabolism of fat, cholesterol, and glucose follow patterns that repeat every 24 hours, explains Pot. “Eating inconsistently may affect our internal body clock,” she says.
And that disruption might lead to weight gain and other health risks.
But just how significant is the effect of varying your meal times?
“This is a really important and valid question which we unfortunately cannot answer yet,” says Pot.
“It would be of great interest to fully understand how much impact disruptions in our circadian rhythms could have on [our] obesity risk.”
So for now, it seems like a good idea to eat at the same times every day if you can.
But if you can't, there are plenty of other ways to stay healthy, too.%MCEPASTEBIN%